DUBAI HEALTH CARE CITY (DHCC)
Location: Dubai
Client: Health Care City
Consultant: Arif & Bintoak
Main Contractor:
Contract Date: 24-November-2004
Completion Date: 15-April-2005
Project Summary
Piling
Pile Diameter: 600mm – 750mm
Pile Quantity: 1,125 nos.
Pile Length: 16.00m – 20.00m
Total Pile Length: 20,000m
Shoring
Shoring Type: 75mm secant pile wall
Shoring Length: 721rmt
Retaining Depth: 11.0m
Soil Anchors: 16m – 22m, 825nos.
Earth Works
Bulk Excavation: 110,000m3