SHAMS ABU DHABI GATE DISTRICT (SUN & SKY TOWERS)
Location: Abu Dhabi
Client: Sorouh Real Estate
Consultant: RW Armstrong & Hyder Consulting
Main Contractor:
Contract Date: 15-May-2006
Completion Date: 30-June-2007
Project Summary
Piling
Pile Diameter: 900mm – 1200mm
Pile Quantity: 1,076 nos.
Pile Length: 23.00m – 37.00m
Total Pile Length: 33,000m
Shoring
Shoring Type: 600mm to 750mm secant piling wall
Shoring Length: 900rmt
Retaining Depth: 10.35m
Soil Anchors: 20m – 22m, 1162nos.
Earth Works
Bulk Excavation: 340,000m3