THE LAGOONS (6 PLOTS)
Location: Dubai
Client: Sama Dubai
Consultant: Meinhardt Singapore
Main Contractor:
Contract Date: 21-December-2006
Completion Date: 23-August-2008
Project Summary
Piling
Pile Diameter: 900mm – 1500mm
Pile Quantity: 916 nos.
Pile Length: 14.25m – 45.00m
Total Pile Length: 26,000m
Shoring
Shoring Type: 75mm contiguous piling wall
Shoring Length: 1,546rmt
Retaining Depth: 9.75 to 17.75m
Soil Anchors: 18m – 26m, 1,162nos.
Earth Works
Bulk Excavation: 560,000m3