U BORA TOWERS
Location: Dubai
Client: Bando Engineering
Consultant: Whitby & Bird Engineering / Aedas Limited
Main Contractor:
Contract Date: 22-November-2006
Completion Date: 15-April-2007
Project Summary
Piling
Pile Diameter: 600mm – 1500mm
Pile Quantity: 1,200 nos.
Pile Length: 16.00m – 45.00m
Total Pile Length: 10,000m
Shoring
Shoring Type: 900mm cantilever contiguous piling wall
Shoring Length: 623rmt
Retaining Depth: 10.60m
Soil Anchors: -
Earth Works
Bulk Excavation: 15,000m3