DR. SULAIMAN AL HABIB MEDICAL CITY
Location: Al Khobar-KSA
Client: Dr. Sulaiman Al Habib
Consultant: HMG Engineering
Main Contractor:
Contract Date: 01-July-2014
Completion Date: 01-February-2015
Project Summary
Piling
Pile Diameter: 800mm – 1200mm
Pile Quantity: 2,037 nos.
Pile Length: 10.0m – 23.0m
Total Pile Length: 35,000m
Shoring
Shoring Type:800 rmt, Secant Pile Wall
Shoring Length: 310 rmt
Retaining Depth: 9.50m